Search results

From Earth Science Information Partners (ESIP)
Results 1 – 12 of 12
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  • meeting details see the ESIP site: esipfed.org/meetings. *** July 8-11, 2014 Copper Mountain/Frisco, CO Add any transportation information and other ideas on
    7 KB (931 words) - 13:21, February 13, 2014
  • vs bit (older) Instructor Material: Becky (Ozobot + Makey-Makey); (copper ink, copper foil, conductive ink) Links of materials through TERC https://external-wiki
    2 KB (276 words) - 13:13, May 17, 2018
  • received a proposal from Copper Mountain, CO, a ski resort, that is within our budget. It is about a 90 min shuttle ride to Copper from the Denver Airport
    4 KB (720 words) - 18:17, February 15, 2014
  • Finalizing preparation for Cluster session at ESIP Summer 2014 Meeting, Copper Mtn/Frisco, CO (Session proposal and title) Invited speaker Mark Walbridge
    4 KB (526 words) - 14:32, June 3, 2014
  • particulates), nitrate, nitrite, elemental carbon, and organic carbonLead, Cadmium, Copper, zinc, Iron, manganese, lead, zinc, and aluminum in PM, meteorologic factors
    1 KB (213 words) - 15:15, October 14, 2009
  • Decided to hold off a bit. Cluster session at ESIP Summer 2014 Meeting, Copper Mtn, CO Possible speakers: Mark Walbridge (LTAR), Simon Liu (NAL), Brad
    5 KB (752 words) - 14:36, February 28, 2014
  • telecon time 3 pm ET. Agenda: Cluster session at ESIP Summer 2014 Meeting, Copper Mtn/Frisco, CO Session proposal and title Goals Identify specific work we
    3 KB (400 words) - 15:04, April 1, 2014
  • Wheat Data Interoperability WG Cluster session at ESIP Summer 2014 Meeting, Copper Mtn, CO Session proposal and title Other possible speaker(s): USDA Regional
    4 KB (440 words) - 21:39, March 10, 2014
  • & Climate Workspace Agenda: Cluster session at ESIP Summer 2014 Meeting, Copper Mtn/Frisco, CO (Session proposal and title) Invited speaker Mark Walbridge
    3 KB (486 words) - 14:43, May 6, 2014
  • wired bidirectional transmission may be possible via in-ground or aerial copper or fiber optics. Think about data acquisition as part of site design. It
    19 KB (2,584 words) - 11:20, April 24, 2014
  • FUNding Friday - P&S is having a no-host happy hour at the Incline Bar @ Copper, Thursday night to work on posters so that they can be up Friday morning
    9 KB (1,502 words) - 16:53, August 25, 2014
  • problem at exposed or mountainous sites. Extensive grounding (e.g. exposed copper wire network) and use of surge protection throughout the power system and
    19 KB (2,521 words) - 13:55, March 28, 2016