Difference between revisions of "GEO US 0901a September 2 Telecon"
From Earth Science Information Partners (ESIP)
(5 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
** Stage 5 Analysing documents | ** Stage 5 Analysing documents | ||
− | *** | + | *** Significant new docs provided by the AQ |
− | *** | + | *** Additional docs from Third World |
Line 20: | Line 20: | ||
== Telecon Discussion == | == Telecon Discussion == | ||
+ | * Friedl: prioritasition in multiple ways is good | ||
+ | * Friedl: EO reports from GEO need to refs 10 yr implementation Plan | ||
+ | * Friedl: Send email to CEOS and GEO Sec re participation in AG |
Latest revision as of 09:48, September 2, 2009
< GEO User Requirements for Air Quality | Report | Documents | Resources
Progress Report
- AQ and Health Report is in phase 4/5/6.
- Stage 4 Methodology has been augmented based on AG feedback.
- Earth Observations, EO, are classified into Direct Observations, Derived Products and Models.
- Users are classified into Raw Data Managers, Analysts, and Decision Makers.
- Stage 4 Methodology has been augmented based on AG feedback.
- Stage 5 Analysing documents
- Significant new docs provided by the AQ
- Additional docs from Third World
- Stage 5 Analysing documents
- Stage 6 Combining Docs/Draft Report
- Just started
- Stage 6 Combining Docs/Draft Report
Plan to have draft report prepared and sent to AG by end of September
Telecon Discussion
- Friedl: prioritasition in multiple ways is good
- Friedl: EO reports from GEO need to refs 10 yr implementation Plan
- Friedl: Send email to CEOS and GEO Sec re participation in AG