Semantic Web Telecons
From Earth Science Information Partners (ESIP)
Telecons[edit | edit source]
Main ESIP page >> Main Cluster page | Previous calls |
1100 PT/ 1200 MT/ 1300 CT/ 1400 ET/ 1900 UT
Phone: 800-508-7631 (international call in: 334-323-3031)
Meeting Code: *8202307*
November 22, 2010 Telecon[edit | edit source]
- Attending (2pm ET)
- Peter, Chris, Hook, Yuqi, Rob, Steve, bhaskar, kai, Erin ?
- Short description of Test Bed
- We went over the slides from Chris's presentation
- http://testbed.gmu.edu/swtestbed/
- Ontology development / engineering?
- Obtain instance data from Chris L. and Petr V.
- Rob, Kai, for reviewing ontology and next level of engineering (RDFS or OWL) with Chris (consult)
- Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
- We went over the summary information from ESDSWG 2010 revised slides
- Metric, value - Chris, Hook. http://wiki.esipfed.org/index.php/Assessing_Impact_From_Workshops
- Length - 3 hr blocks, 1 1/2 hr each
- Content (with 10 mins at end of each major session for summary questionnaire/ evaluation)
- Minimize homonym problem - identify not solve.
- We dropped the more advanced application development
- Decision on presenters for each component
- Intro - Peter 10min
- Use case - Chris - 20 mins
- Model/ ontology - Peter and Rob - 1 hr
- Model/ ontology - Peter and Rob - 10 min
- Materialization - Rahul and Peter - 1 hr
- Summary/ eval - Chris and Hook - 10 min
- Application definition - Rahul and Peter (temp) - 70 min
- Application/query development - reduce (Hook) - 1hr
- Summary Peter - 20 mins
- Final eval - Chris and Hook - 10 mins
- Time line for content development and review.
- three weeks, i.e. before AGU meeting
- Peter to send around summaries
- Need for another telecon before ESIP
- possible short call in the week of Dec 20th...
- Rob asked for any requests for next year's test bed (continuation or new, e.g. Drupal 7)
July 28, 2009 Telecon[edit | edit source]
Recommendations for Semantic Web Markup of Existing XML
Requirements for Products and Services Testbed
- Storage of triples, SPARQL query testing
June 23, 2009 Telecon[edit | edit source]
no telecon - we are all writing proposals
May 26, 2009 Telecon[edit | edit source]
no telecon - AGU meeting
February 24, 2009 Telecon[edit | edit source]
Topics (feel free to add your ideas):
- ESIP participation in ontology development
- veting and getting feedback on specific developments for the data-type ontology
- Data Ontology (CMAPS public server: IHMC Public CMAPS (3)/ user/ESIP-Semantic Web/Data Ontology/SAM_ontology_latest_1_9_01b)
- Address specific questions: Under StructuralRepresentationType. Should we remove DimensionalRepresentationType class since Map, Raster and Vector are also 1 or 2 dimensional in structure. Spectrum and Timeseries could be subclasses of Vector.
- Need to add instances for specific concepts
- Data Ontology (CMAPS public server: IHMC Public CMAPS (3)/ user/ESIP-Semantic Web/Data Ontology/SAM_ontology_latest_1_9_01b)
- discussing how it will be used in a demo
- veting and getting feedback on specific developments for the data-type ontology