Difference between revisions of "Semantic Web Telecons"

From Earth Science Information Partners (ESIP)
(22 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
__NOTOC__
 
__NOTOC__
  
=Telecons=
+
==Telecons==
  
 
{| width="96%"
 
{| width="96%"
Line 7: Line 7:
 
| <small>[[Main_Page|Main ESIP page]] >> [[Semantic_Web|Main Cluster page]]</small>
 
| <small>[[Main_Page|Main ESIP page]] >> [[Semantic_Web|Main Cluster page]]</small>
 
| align="right"|<big>[[Previous ESIP Semantic Web cluster calls|'''Previous calls''']]</big>
 
| align="right"|<big>[[Previous ESIP Semantic Web cluster calls|'''Previous calls''']]</big>
|}<br />
+
|}
  
Ongoing - Fourth Tuesday - 1300 PT/ 1400 MT/ 1500 CT/ 1600 ET/ 2100 UT<br>
+
* Ongoing - '''2nd Tuesday of each month''' at 4:00 PM Eastern
 +
* Zoom link: https://us02web.zoom.us/j/82488826142?pwd=S1VXQjlYNjgraW84ODdoMnNRYVJHUT09
 +
* Phone access (find your local number): https://us02web.zoom.us/u/kddSDsO5o5
 +
* See the [https://www.esipfed.org/get-involved/telecon-calendar ESIP Calendar] for info on joining the Zoom meeting.
  
Join the meeting from your computer, tablet or smartphone.
+
==Committee meeting notes==
https://www.gotomeeting.com/join/976796333
 
  
You can also dial in using your phone.
+
== 2022 ==
  
United States: +1 (872) 240-3212
+
<big>'''All notes are recorded in [https://docs.google.com/document/d/1eGatE85UHUAkgYVlgEAxxg7ICsUPzrLTcDqNm2oVdJ4/edit?usp=sharing Google Docs here]'''
 +
</big>
  
Access Code: 976-796-333
+
== 2021 ==
  
== October 25, 2016 ==
+
<big>'''All notes are recorded in [https://docs.google.com/document/d/1GKzJjK_NPE-L_X4ot7CvmmeRToenwE1-MZKCWt9AXzg/edit?usp=sharing Google Docs here]'''
* ESIP Budget Approval
+
</big>
** The ESIP Finance Committee has approved all of the items requested in this year's budget. Our theme is outreach and collaboration. ESIP has approved external outreach by approving travel to RDA and the EarthCube All Hands meeting. We have also been approved to host a one day GeoSemantics Symposium the day before the Winter Meeting starts. The goal of the symposium is to bring together ESIP clusters and committees, along with external groups, and begin discussing collaborations and road mapping to maximize reuse and avoid duplication of efforts. Logistics for the symposium are just beginning. The agenda will begin to take shape over the next few weeks. Those with suggestions on topics or format are encouraged to reach out to Tom and Beth.
 
* ESIP Winter Meeting Session Proposals
 
** Session proposals are due October 31. Two topics emerged on the call. The ToolMatch group will host a hands-on session to map datasets and tools. A second idea emerged for a "Semantic Community Engagement Plan" that would cover ontology governance plans, leveraging other communities, finding/identifying/promoting ontologies via the portal. Details on this second session will be worked out in the next few days.
 
* Ontology Portal Evaluation
 
** Annie provided an updated on the portal evaluations. Use cases have been identified to use in the evaluation. Reviewers have also been identified; however, the reviewers have not yet committed to the reviews. Annie will be out starting mid-November on maternity leave. The group all agreed we should not try to rush and start the review process before Annie leaves. Ontology portal evaluations will be put on hold and will resume around March 2017.
 
* Semantic Roadmap
 
** Bhaskar provided an update on the roadmap efforts. He will circulate the latest version of the Google Doc and the group will work to identify writers for each section. Ruth suggested a distributed approach in which writers get only a paragraph or two to write and it becomes a distributed writing effort. We'll review at the November call who has shown interest in contributing
 
* Collaboration Area Poster
 
** ESIP has requested one poster from each cluster and committee to be displayed at the Winter Meeting. These posters will be up throughout the entire ESIP meeting not just at the poster session. Beth had created a similar poster last year to highlight our committee. She will make that poster available and we can collaboratively edit it.
 
  
== September 27, 2016 ==
+
== 2020 ==
* Ontology Portal Evaluation
 
** Erin provided an overview of how ESIP was providing evaluations for NASA projects and was expanding into a more general framework for software and project evaluations. This new evaluation framework will be used to provide an independent evaluation of our two ontology portals. The evaluations will try to cover a number of facets including cost, maintenance and support options, functionality, and science use case evaluation
 
** Annie continued the discussion with a call for use cases, which will be supplied to the evaluation committee. Beth, Lewis, and others have already contributed several use cases to a github repository at https://esipfed.github.io/stc/UseCases/STCUseCasesAndRequirements.html. Everyone is asked to review the use cases for detail and clarity. Ensure that the actors and workflow are clear and unambiguous. For example, is it clear who the "user" is (developer, domain scientist, etc.)?
 
** Beth and Mike Huhns volunteered to review the use cases. Others are encourage to do so as well. All feedback needs to be sent to Annie B. by October 12 so that the evaluation can can begin
 
* Road Map
 
** Bhaskar gave an overview of his objectives for a Semantic Web Roadmap
 
** He suggests something that is more fundamental than the EarthCube roadmap from a few years ago
 
** For example, what is the basic value proposition of the Semantic Web? How and where can it add value to Earth Sciences
 
** A preliminary outline was sent around to the committee via email. Bhaskhar is currently evaluating existing efforts in this area and will soon (next week) produce a shared google doc for collaborative editing on the sections of the roadmap
 
** Ruth suggested that we identify folks who can dig into repositories and data centers to really get at the value proposition
 
** Several open access outlets are being considered for the final publication. A draft is anticipated by the Winter 2017 ESIP meeting
 
* RDA Collaboration
 
** Soren presented a possible RDA collaboration involving ontology governance
 
** RDA VSIG is seeking exemplars of open source governance models. It was suggested that the SWEET model could be put forward as an ESIP exemplar.
 
** Ruth volunteered to also present her work on the sea ice ontologies and their model
 
** It was suggested that Ruth, Lewis, and anyone else interested, form a temporary subgroup to document and discuss the existing models and prepare a submission to RDA. Ruth will be traveling for the next few weeks and Lewis was not at this call. We will reach out to Lewis and continue the discussion offline once Ruth returns.
 
* Announcements
 
** Ruth mentioned that Purls are becoming available again via Internet archive. Good news for existing ontologies that use Purl URIs
 
  
== May 24, 2016 ==
+
<big>'''All notes are recorded in [https://docs.google.com/document/d/1wMVNI1xuG2uDasMcBxk57y1lSJfq0tKRxDvDXhYmpb8/edit?usp=sharing Google Docs here]'''
* ESIP Ontology Portal Evaluation
+
</big>
** The summer meeting will be used to gather feedback from the broader ESIP community on which features and functionality are needed in a portal
 
** The Business and Planning session at the summer meeting will be used to further discuss our plans for what the evaluation will look like
 
** There was a lot of discussion on the two current portals, their functionality, how they handle versioning, and how they handle URIs
 
** John proposed a URI scheme for his portal: http://esipsw.org/ont/<authority>/<ontname>/<termID>
 
*** there was some concern about the new domain
 
*** John and Tom will work with Erin to see what our options are for using http://esipfed.org
 
* Business and Planning session at the summer meeting
 
** current agenda includes an open discussion on an open source SWEET and what that would entail and continued discussion on the ontology portal evaluation
 
** any additional agenda items should be sent to Tom
 
* Cloud Access
 
** We have been offered access to EarthCube's cloud infrastructure for testing of semantic applications
 
** It was determined that this may be premature for our group. The ontology portal already has an AWS instance and other applications are not yet ready for this type of deployment. The group would also like to wait to see the outcomes of upcoming EarthCube meetings to see how this cloud infrastructure will fit into the technology architecture and long term vision of EarthCube
 
  
== March 22, 2016 ==
+
== 2019 ==
* Discussion on sessions for the summer meeting. Session proposals are due April 1.
 
** We currently have 3 session ideas on the table. 1.) a general Semantic Technologies business and planning session - possibly to include a ToolMatch component, 2.) a tutorial on Linked Data, creating a scheme, publishing and consuming semantic content, and 3.) a tutorial/discussion on what ontologies are currently available, how to find them, and what can I do with them once found
 
** There is also a related session being put together by Soren Scott regarding software readiness levels and governance. The topics will be relevant to our committee as we begin to deploy cloud resources to host semantic projects
 
* Phil Yang and Emily Law are beginning an initial study on costs and design of cloud resources to host semantic applications ESIP-wide
 
* We are collecting ideas for an [[Semantic_Web_Ontology_Portal_Evaluation_Approach | ontology portal evaluation ]]
 
* We identified the following liaisons to external groups. These will be added to the main wiki page in the near future. The intent here is that these individuals are already active participants in external semantic-related groups. Liaisons volunteer to periodically report back to this committee on relevant developments and potential collaboration areas. If applicable, liaisons may help engage their groups on behalf of ESIP. The current approach for reporting is to allot 10 minutes at each future telecon for reporting out by liaisons. If more time is needed then liaisons should contact the chair prior to the call
 
** Ruth Duerr - EarthCube Semantics Working Group
 
** Brandon Whitehead - Open Geospatial Consortium and RDA - particular focus on GeoSciML, ESD WG and HydroWG, RDA Provenance Group
 
** Soren Scott - RDA Provenance WG
 
** Stephen Richard - RDA Vocab Services, Terminology IG, and DataType Registry WG
 
** Stace Beaulieu - USGS CDI Semantic Web Working Group
 
** Adam Shepherd - The Ontolog Community
 
** Lewis McGibbney - W3C+OGC Spatial Data on the Web (SDW)
 
** Bhaskar Ramachandran - The International Association for Ontology and its Applications (IAOA), http://www.iaoa.org/ 
 
** Pascal Hitzler - Ontology Design & Patterns Association
 
  
== January 27, 2016 ==
+
<big>'''All notes are recorded in [https://docs.google.com/document/d/19agZraGms4vsv7S2SP0SpPWuTtfIQOet4NkyvMUEClQ/edit?usp=sharing Google Docs here]'''
Discussion continued on the transition from Cluster to Committee. The main focus of the call was on what the structure of the Committee and its short term objectives should be.
+
</big>
* Tom and Beth would like the Committee to commit to an AWS server for the long-term hosting of ESIP semantic resources (such as the ontology portal, ESIP Linked Data, and possibly projects that complete the Testbed and need a permanent or semi-permanent home)
 
** The process for what does and does not get deployed on this server is still an open question
 
** Discussions have begun with ESIP Ex Com and other Clusters/Committees to think about reusing Technology Readiness Levels, software reuse policies, and cloud computing expertise
 
** Security will certainly be an issue - this is noted, but no real policy/procedure at the moment
 
** Cost was also discussed - we will touch base with Cloud Computing Cluster and others with experience to get a better sense of exact resources needed and proper configuration
 
** In general, everyone thought this was something the Committee should commit to, but discussion needs to continue on above issues
 
  
* What are other areas the Committee should commit its resources to?
+
<big>'''The COR subgroup notes are recorded in [https://docs.google.com/document/d/11PDLvjPWvkCt50ikZJZgrBLQMhE1_pbN-FUdp0AEzdM/edit?usp=sharing Google Docs here]'''
** It was suggested (Nancy) that Hackathons could be an ideal way to engage others in ESIP - hands-on themed hacking where we address a current ESIP problem or limitation
+
</big>
** Semantic themed events are a possibility. For example, extra drink tickets at an ESIP meeting for participating in semantic demo session or best use of semantic technologies
 
** Engagement with external semantic groups is needed - a google doc is being generated to list high-priority groups and look for existing ESIP members who may volunteer to be liaisons to these groups
 
*** The google doc is available for editing [https://docs.google.com/document/d/1VGWiOjm16iUrn8JQEZ7JAbjnGvGnZZJgBXk7Xztsz-I/edit?usp=sharing here]
 
  
* Budget is currently under development and will soon be submitted to ESIP
+
==2018==
** current items include AWS server, student fellows, travel (to be spread amongst committee members as needed)
+
<big>'''Archives notes are recorded in [https://docs.google.com/document/d/1vdHTXbp1G6wiwdyrC0Uw9IKgTgJF4G6vjThR2eNJ-q8/edit?usp=drive_web Google Docs here]'''
** any other thoughts/ideas please share
+
</big>
 +
*[http://wiki.esipfed.org/index.php/ST_Notes_2018 Please See Archived Notes Here]
  
* Topic for next call (February 23) is ontology governance. There are some notes and some thoughts on one possible implementation [http://wiki.esipfed.org/index.php/Ontology_Governance here]. Please review and bring ideas/comments to the next call
+
==2017==
  
== September 23, 2015 ==
+
*[http://wiki.esipfed.org/index.php/ST_Notes_2017 Please See Archived Notes Here]
[http://www.michellecheatham.com/ Michelle Cheatham ] presented on Ontology Design Patterns. The presentation is available here: [[File:ODP_introduction.pdf]]
 
  
The links mentioned in the presentation are:
+
==2016==
[http://schema.geolink.org GeoLink Schema] and [http://ontologydesignpatterns.org/wiki/Main_Page OntologyDesignPatterns.org]
+
*[http://wiki.esipfed.org/index.php/ST_Notes_2016 Please See Archived Notes Here]
  
* John Graybeal mentioned that work on his ontology portal was resuming after a short hiatus
+
==Prior to 2016==
* John also mentioned the newly formed EarthCube Semantic Web Working Group. He invited everyone to join their telecons, which are the 3rd Thursday of each month at 9am
+
*[http://wiki.esipfed.org/index.php/ST_Notes_Prior_To_2016 Please See Archived Notes Here]
* Discussion began on the cluster's use of OBO Foundry Principles for Ontology Governance
 
** it was mentioned that not all of the principles may be needed
 
** it was mentioned that enforcement of the principles we do adopt will need to be thought through
 
** the main portion of the discussion centered around if we should be in the business of hosting a production ontology portal at all. What is the sustainability model for such a portal? John Graybeal mentioned that there is the possibility that NSF EarthCube could fund the effort and ESIP would maintain it; however, this is not guaranteed at the moment.
 
** Patrick West mentioned that we should be careful to distinguish between ontology repository and ontology registry. We clearly have use cases for both. Some people host their own ontologies and would just like to reference them in a registry while others need dedicated hosting. It is thought that the current ontology portal solutions would support both of these cases.
 
** discussion will continue via email and at the next telecon
 
  
== June, 2015 Telecon ==
+
==September 26, 2017==
This meeting focused on the Long-Term Goals and Roadmapping Session for the Semantic Web Cluster at the ESIP Summer Meeting. This will likely consist of a brainstorming session in the morning, followed by an afternoon session focused on strategic planning and the long term vision of the cluster.  Important topics include:
+
<big>'''All notes are recorded in [https://docs.google.com/document/d/1K5pdc152hHmGJenbSjVl82ok3M8B2oGEsgqYiEioPRs/edit?usp=sharing Google Docs here]'''</big>
# ontology portal
 
# ontology governance
 
# long term infrastructure
 
# [http://www.schema.org schema.org]
 
# long term development plan (1-2 years)
 
 
 
Other notes:
 
* Is there a way to check/verify that the room housing the roadmapping session has an established internet connected with appropriate bandwidth for, at minimum, two people to participate via tele/videoconference?  (Question for Erin or Annie)
 
 
 
Open questions:
 
* Were any SW testbed projects submitted this year?
 
* Are there any SW apps (either academic or private sector) ripe for presentation?
 
* Is there someone available to talk about ODPs?
 
** [http://www.geolink.org Geolink.org] would overlap nicely.
 
 
 
== March, 2015 Telecon ==
 
* A new special issue of Earth Science Informatics focusing on [http://link.springer.com/journal/12145/8/1/page/1 Semantic e-Science] is now available.
 
 
 
* The [http://www.35igc.org/ 35th International Geological Congress] will be held in Cape Town, South Africa from 08/27 to 09/04, 2016.  The organizers are accepting proposals for [https://www.allevents.co.za/ei/getdemo.ei?id=222&s=_3F00S0JZ9 symposia, tutorials, workshops, and business meetings].  This may be an excellent opportunity to establish a presence via an ''Introduction to Geoscience Semantics'' tutorial (just an example, there are others) or organizing domain workshops (and, obviously, organizing conference symposia).  Watch email and/or Loomio for discussions and ideation.
 
 
 
* Similarly, cluster members should organize their thoughts regarding proposals for the upcoming ESIP Summer Meeting.  Watch for information about a ToolMatch Hackathon as well as a followup session to the previous Winter Meeting's Schema.org session. 
 
 
 
* Is there any ontology portal software (or software stack) other than BioPortal?  It seems BioPortal is the best option.  ESIP's BioPortal instance has a stable URI (is it the [http://semanticportal.esipfed.org/ontologies semantic portal link], or [http://ec2-50-18-136-210.us-west-1.compute.amazonaws.com/ the Amazon AWS link], or something else?), but does have some unstable bits.  The application will be updated to the current version in the next few months. 
 
 
 
* The Semantic Web Cluster will proceed with its application to move from ''cluster'' to ''committee'' after much positive feedback.
 
 
 
== April, 2014 Telecon ==
 
 
 
* Marshall Ma (RPI) presented on ontology engineering and ontology reuse in the context of the Global Change Information System. Slides available at: http://orion.tw.rpi.edu/~xgmatwc/20140422_Experience_GCISontology_engineering.ppt
 
 
 
* Peter presented discussions ongoing with ESIP that may lead to Clusters not having to go through Products and Services to receive funding. This should be worked out, and possibly in place, by summer meeting.
 
 
 
== March, 2014 Telecon ==
 
* telecon cancelled due to competing workshops and meetings
 
 
 
== February 25, 2014 Telecon ==
 
 
 
* Planning for Semantic Web activities at the summer meeting
 
* Test Bed call for proposals out soon – opportunities for Sem Web Cluster
 
* Possible interactions with newly forming Clusters (Disaster and Data Science)
 
* QUDT Ontology Discussion (Beth Huffer)
 
* Ontology Reuse (Beth Huffer)
 
[[SWTeleconNotes20140225]]
 
 
 
== January 28, 2014 Telecon==
 
 
 
* Review of 2014 Winter Meeting and Next Steps
 
[[SWTeleconNotes20140128]]
 
 
 
== October 29, 2013 Telecon==
 
 
 
* Previous action items
 
* Update on ToolMatch
 
* schema.org - initial progress (http://wiki.esipfed.org/index.php/DatasetSchema)
 
** NSIDC
 
** Interest from BCO-DMO
 
* Any progress on PROV-ES - http://wiki.esipfed.org/index.php/PROV-ES
 
* Planning for Winter meeting sessions
 
** schema.org
 
** toolmatch?
 
* Other business
 
 
 
[[SWTeleconNotes20131029]]
 
 
 
== September 2013 NO Telecon==
 
 
 
== August 27, 2013 Telecon==
 
 
 
* Previous action items
 
* Feedback on Summer meeting sessions
 
** PROV-ES - http://wiki.esipfed.org/index.php/PROV-ES
 
** schema.org/ dataset extension for Earth Science - http://wiki.esipfed.org/index.php/DatasetSchema
 
* Next steps on schema.org
 
* Update on ToolMatch
 
* Initial planning for Winter meeting
 
* Other business
 
 
 
[[SWTeleconNotes20130827]]
 
 
 
== June 25, 2013 Telecon==
 
 
 
* Previous action items
 
* Ontology governance update (Peter)
 
* Summer meeting sessions
 
** PROV-ES - http://wiki.esipfed.org/index.php/PROV-ES (Hook/Curt)
 
** schema.org/ dataset extension for Earth Science - Mashups and ToolMatch may fit at the end of this. http://wiki.esipfed.org/index.php/DatasetSchema
 
* Discuss remainder of 2013 activities
 
* Other business
 
 
 
[[SWTeleconNotes20130625]]
 
 
 
== April 30, 2013 Telecon ==
 
 
 
* Previous action items
 
** Summer meeting sessions
 
** Toolmatch/rules update (Chris)
 
* Ontology governance update (Peter)
 
* Ontology portal (Line)
 
* Discuss 2013 activities
 
** schema.org and datasets and Earth Science (Brian)
 
** PROV-ES
 
** VISKO
 
** IQ cluster interactions
 
* Other/New items
 
 
 
[[SWTeleconNotes20130430]]
 
 
 
== January 22, 2013 Telecon ==
 
 
 
* Previous action items (see notes)
 
* * Winter meeting report on sessions
 
** Toolmatch/rules update (Chris/ Eric)
 
** Ontology governance update (Peter)
 
** Ontology portal (Line)
 
* Discuss 2013 activities
 
** schema.org and datasets and Earth Science (Brian)
 
** PROV-ES
 
** VISKO
 
** IQ cluster interactions
 
* Other/New items
 
 
 
[[SWTeleconNotes20130122]]
 
 
 
== November 27, 2012 Telecon ==
 
 
 
* Previous action items (see notes)
 
* Toolmatch update (Chris/ Eric)
 
* Ontolog update (Dalia if attending, others)
 
* Ontology governance update (Peter)
 
* IQ cluster interactions/ update (Peter)
 
* Winter meeting plans/ sessions
 
* Other/New items
 
 
 
[[SWTeleconNotes20121127]]
 
 
 
== October 30, 2012 Telecon ==
 
 
 
* Previous action items (see notes for today)
 
* Toolmatch update (Chris/ Eric)
 
* Ontolog update (Dalia if attending, others)
 
* Ontology governance beyond what we have (update; Peter, maybe a presentation)
 
* Report from EarthCube 'next generation' meeting, re: semantics (Peter)
 
* Request for input on NASA ESDSWG Semantic Tech Quad Chart (Brian if able to join, others)
 
* Other reports on Semantics Activities (any)
 
* See update from Line Pouchard on ESIP Ontology Portal
 
* Other/New items
 
 
 
[[SWTeleconNotes20121030]]
 
 
 
== September 25, 2012 Telecon (draft) ==
 
 
 
* SW hackathon session topics
 
** ToolMatch Talkoot
 
**
 
* SW Tutorials
 
** Experts sessions
 
* SW hands on
 
** Cross cluster sessions
 
* Ontolog sessions advertisement (EarthCube related) - Dalia
 
** update
 
* Ontology governance by cluster
 
** Functions; ticket, comment, tracking update
 
** What's put into Portal and by whom
 
** Curation guidance
 
* Other business
 
 
 
[[SWTeleconNotes20120925]]
 
 
 
== August 28, 2012 Telecon ==
 
 
 
* ToolMatch Talkoot next steps
 
** Other SW hackathon session topics
 
* Ontolog sessions advertisement (EarthCube related) - Dalia
 
** http://ontolog.cim3.net/cgi-bin/wiki.pl/
 
* SWC Role in Nov. NASA ESDSWG meeting (if any)
 
* Planning for 2013 ESIP Winter meeting
 
** Tutorials/ hackathon
 
** Experts sessions
 
** Cross cluster sessions
 
* Bioportal @ ORNL - http://ec2-50-18-136-210.us-west-1.compute.amazonaws.com
 
** Status
 
** Feedback
 
** Name? "ESIP-OPortal" (working title)
 
* Ontology governance by cluster
 
** What's put into the ESIP-OPortal and by whom
 
** Curation guidance
 
* Other business
 
 
 
[[SWTeleconNotes20120828]]
 
 
 
== July 24, 2012 Telecon ==
 
 
 
* Outcome discussion of ToolMatch Talkoot and next steps.
 
* General ESIP meeting discussion and planning for 2013 Winter meeting
 
** Tutorials/ hackathon
 
** Experts sessions
 
* Bioportal @ ORNL
 
** Status
 
** Ontologies governance by cluster
 
* Other business
 
 
 
[[SWTeleconNotes20120724]]
 
 
 
== June 26, 2012 Telecon ==
 
 
* Bioportal @ ORNL
 
* SWEET and GCMD discussion
 
* Data Quality ontologies governance by cluster
 
* Planning for the ToolMatch Talkoot and Summer
 
* EarthCube Semantic Web community group report from Charrette and status
 
 
 
[[SWTeleconNotes20120626]]
 
 
 
== May 22, 2012 Telecon ==
 
 
 
* Planning for the ToolMatch Talkoot and Summer
 
* Bioportal @ ORNL
 
* Data Quality ontologies governance by cluster
 
* EarthCube Semantic Web community group status.
 
* Other topics
 
 
 
[[SWTeleconNotes20120522]]
 
 
 
== April 24, 2012 Telecon ==
 
 
 
USGCRP/NCA/GCIS Overview<br>
 
Global Change Information System<br>
 
Curt Tilmes, USGCRP NCO<br>
 
[[Media:GCIS_ESIP_2012-04-24.pptx | Presentation Slides]]
 
 
 
== March 27, 2012 Telecon ==
 
 
 
* Introductions (Chris Lynnes chairing)
 
* Moment of silence in memory of Rob Raskin
 
* Current Activities
 
** ESSI-LOD
 
** ESIP network
 
** [http://wiki.esipfed.org/index.php/ToolMatch ToolMatch], questions:
 
*** [[ToolMatch Identifiers|How to identify the main class instances, datasets and tools?]]
 
*** [[ToolMatch Publishing|How to publish triples?]]
 
** [http://wiki.esipfed.org/index.php/Applications_of_Semantic_Web_for_Earth_Science white paper] on semantic web usage in Earth Science
 
** Ontology repository tesbed via Products and Services APPROVED (update from Mike or Line)
 
* Navy SemWeb showcase (NASA tech. infusion, and ESIP) - Hook
 
** Report/ Feedback
 
* New Activities
 
** Sessions for ESIP summer?
 
*** Early planning
 
** Sessions for AGU meeting - http://wiki.esipfed.org/index.php/2012_AGU_ESSI_Session_Ideas
 
** Please ADD other new activities here
 
* Future agenda items
 
** SWEET transition
 
** Choosing a new representative for the SWEET governance
 
 
 
[[SWTeleconNotes20120327]]
 
 
 
== February 28, 2012 Telecon ==
 
 
 
* Introductions
 
* Update on Ontology repository proposal to Products and Services
 
* Current Activities
 
** ESSI-LOD
 
** ESIP network
 
* Update on New Activities
 
** [http://wiki.esipfed.org/index.php/ToolMatch ToolMatch], an effort to use ontologies and linked data to match tools and services with data.
 
** [http://wiki.esipfed.org/index.php/Applications_of_Semantic_Web_for_Earth_Science white paper] on semantic web usage in Earth Science
 
** OPeNDAP support of RDF
 
* Navy SemWeb showcase (NASA tech. infusion, and ESIP) - Hook
 
 
 
[[SWTeleconNotes20120228]]
 
 
 
== January 24, 2012 Telecon ==
 
 
 
* New Telecon Time Discussion
 
* Discuss/review outcomes of Winter Meeting
 
** Updates on working activities
 
*** Erin - ESIP Network progress
 
*** Eric/Tom - ESIP AGU project
 
** New activities for 2012 from Winter ESIP meeting
 
*** Chris - tools/dataset project
 
*** Chris will work on EarthCube white paper
 
*** data types/service ontologies needs to be revisited
 
*** James Gallagher has a possible use of semantics with Opendap.
 
**** Chris - could you use RDF and Opendap to create a integrated visualization from opendap servers
 
* Other items
 
 
 
[[SWTeleconNotes20120124]]
 
 
 
==December 27, 2011 Telecon==
 
 
 
NO telecon in December
 
 
 
== November 29, 2011 Telecon ==
 
 
 
* Identify goals/outcomes of Winter Meeting
 
* Erin will demonstrate ESIP Network progress
 
* Eric/Tom will give more updates/questions about ESIP project
 
* Greg will give an Information Quality Presentation (needs from Semantic Web)
 
 
 
[[SWTeleconNotes20111129]]
 
 
 
== October 25, 2011 Telecon ==
 
 
 
* Cluster activities
 
** Quality:  needed for Info Quality Semantic Web Primer
 
*** Status?
 
* Plans for Winter meeting
 
* Eric/Tom activities
 
* ESIP Network Use Case
 
** Status?
 
* New activities
 
 
 
[[SWTeleconNotes20111025]]
 
 
 
== September 27, 2011 Telecon ==
 
 
 
* AAG
 
* Cluster activities
 
** Quality:  needed for Info Quality Semantic Web Primer
 
** Data / Service ontology
 
*** Status?
 
** Preservation and Stewardship
 
** Discovery
 
*** Status?
 
** Joint session with NASA TIWG in Nov. ESDSWG meeting
 
*** Demonstrations
 
* Eric/Tom activities
 
* ESIP Network Use Case
 
** Status?
 
* New activities
 
** Casting ontology
 
** Revisit tutorials and webinars
 
 
 
[[SWTeleconNotes20110927]]
 
 
 
== June 28, 2011 Telecon ==
 
* ESIP Summer Meeting
 
** USE CASES NEEDED!
 
*** Quality:  needed for Info Quality Semantic Web Primer
 
*** Data / Services:  needed for ontology development
 
*** Preservation and Stewardship -- will be discussed during session.
 
** Joint session with Info Quality
 
*** When is it?  2:15-3:00
 
*** Semantic Web primer for Info Quality?
 
** Joint session with Preservation and Stewardship
 
*** When is it?
 
*** Semantic Web primer for Preservation and Stewardship?
 
** Semantic Web Cluster meeting, Friday at 8:30
 
* ESIP Network Use Case
 
** Projects Ontology
 
** Use of TestBed?
 
[[SWTeleconNotes20110628]]
 
 
 
== May 24, 2011 Telecon ==
 
 
 
* ESIP summer SW technical sessions on ontology development (quality, data and service, provenance/ stewardship)
 
** use cases needed for each of these by June telecon
 
** who will lead each of these
 
* SW tutorial
 
** confirm format
 
** presenters
 
** scheduling
 
* NASA TIWG SW plans (ESIP meeting and general interactions with SW cluster)
 
* Testbed status update - if needed
 
* Add agenda items here.
 
 
 
[[SWTeleconNotes20110524]]
 
 
 
== March 22, 2011 Telecon ==
 
 
 
* Plan for AGU sessions for fall meeting
 
* ESIP summer SW technical sessions on ontology development (quality - yes, data and service - yes, casting - too early)
 
** use cases needed for each of these
 
* Testbed status update (from last telecon)
 
* Add agenda items here.
 
 
 
[[SWTeleconNotes20110322]]
 
 
 
== February 22, 2011 Telecon ==
 
 
 
* Planning for Summer Meeting (theme: information and data quality)
 
** Breakouts
 
** Tutorial
 
** Ontology Working Session
 
*** Casting?
 
* Testbed
 
** Status
 
** Needed features?
 
* Any more inputs for Erin on collaboration tools?
 
 
 
[[SWTeleconNotes20110222]]
 
 
 
== January 25, 2011 Telecon ==
 
 
 
* Review of ESIP Winter Semantic Web Tutorial (Peter, Chris, Hook, Rob)
 
** Evaluation
 
** Relation to NASA Tech Infusion activities and goals
 
** Relation to SW testbed and requirements on the testbed
 
** Same form or others (e.g. Expert Panel, etc.)
 
** Where and when next?
 
* Using the http://esipfed.org/ site for dereferencible ontology IRIs.  (Chris L)
 
* Continuation of Data-Type and Service ontology work (Peter)
 
* Ontology development to support 'casting' (Brian)
 
* Summer meeting theme data and information quality - and possible quality ontology work session
 
* Other topics?
 
**Utopia uses semantic services to annotate PDFs, but is focused on biomed. Needs earth science add-ons. Check it out at http://www.utopiadocs.com/documents/  Looking to create a PDF-based poster archive for ESIP with Utopia-like interface.  NEW:  If this is of any interest to you, I'll spin up a Basecamp site. so email me  [bruce at tnms.org] and I'll sign you up. Here is another resource from bio-med land.  http://code.google.com/p/annotation-ontology/ (Bruce C)
 
* Time - 4pm ET
 
 
 
[[SWTeleconNotes20110115]]
 
 
 
== November 22, 2010 Telecon==
 
 
 
* 2pm ET
 
* Short description of Test Bed
 
* Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
 
* Decision on presenters for each component
 
* Time line for content development and review.
 
 
 
[[SWTeleconNotes20101122]]
 

Revision as of 14:46, June 14, 2022


Telecons

Main ESIP page >> Main Cluster page Previous calls

Committee meeting notes

2022

All notes are recorded in Google Docs here

2021

All notes are recorded in Google Docs here

2020

All notes are recorded in Google Docs here

2019

All notes are recorded in Google Docs here

The COR subgroup notes are recorded in Google Docs here

2018

Archives notes are recorded in Google Docs here

2017

2016

Prior to 2016

September 26, 2017

All notes are recorded in Google Docs here