Difference between revisions of "NASA ROSES 08 Checklist"

From Earth Science Information Partners (ESIP)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Need Integrated system solutions diagram to portray/illustrate our projct: http://nasascience.nasa.gov/earth*science/applied*sciences/solicitations/information*to*support*proposals
+
Need Integrated system solutions diagram to portray/illustrate our project: http://nasascience.nasa.gov/earth*science/applied*sciences/solicitations/information*to*support*proposals
 +
* [http://nasascience.nasa.gov/earth-science/applied-sciences/solicitations/ISS_chart_download.ppt blank diagram]
  
 
+
===Proposal summary:===
Proposal summary:
 
 
* Explicitly state which of NASA 8 areas the proposal relates to (if more than 2 identify top 3)
 
* Explicitly state which of NASA 8 areas the proposal relates to (if more than 2 identify top 3)
 
* how does project respond to priority topic (AQ)
 
* how does project respond to priority topic (AQ)
  
Decision Support:  
+
===Decision Support: ===
 
* describe activity  
 
* describe activity  
 
* magangemt, policy, business topic or issue  
 
* magangemt, policy, business topic or issue  
Line 12: Line 12:
 
* quantify pre*project baseline  
 
* quantify pre*project baseline  
  
E.S. Research Results:
+
===E.S. Research Results:===
 
* Identify all data products used.  
 
* Identify all data products used.  
  
In Tech approach:  
+
===In Tech approach: ===
 
* perceived impact of work  
 
* perceived impact of work  
 
* objectives and relevance to NASA past/present/future
 
* objectives and relevance to NASA past/present/future
Line 23: Line 23:
 
* Approach to quantify improvements in the system performance (risk/uncertainty)
 
* Approach to quantify improvements in the system performance (risk/uncertainty)
 
* approach to quantify socioeconomic value and benefits for resulting improvements
 
* approach to quantify socioeconomic value and benefits for resulting improvements
* key technical, policy, operation and magement challenges and the approach to address challenges
+
* key technical, policy, operation and engagement challenges and the approach to address challenges
* describe tools, system, assessment in detail including decisiion analysis factors, unique roles for E.S. data and other pertinent info.
+
* describe tools, system, assessment in detail including decision analysis factors, unique roles for E.S. data and other pertinent info.
  
  
Transition Approach:
+
===Transition Approach:===
 
* Articulate transition plan
 
* Articulate transition plan
 
( GEOSS AIP, tutorials with EPA)
 
( GEOSS AIP, tutorials with EPA)
  
Performance Measures:  
+
===Performance Measures: ===
 
* Quantitative/Qualitative measures of outcome, results and value of project
 
* Quantitative/Qualitative measures of outcome, results and value of project
  
Anticipated results
+
other performance measures:
 +
* forecast skill scores
 +
* change in planning time
 +
* change in response time (e.g. disaster response time)
 +
* percentage of population served
 +
* level or certainty/uncertainty in the decision support system
 +
* false negatives/false positives
 +
* exposure assessment time and accuracy
 +
* control measure effectiveness
 +
 
 +
===Anticipated results===
 
* State quantitative hypothesis  
 
* State quantitative hypothesis  
 
* estimate expected improvements
 
* estimate expected improvements
  
Project Management: (2pg)
+
===Project Management: (2pg)===
 
* plan of work
 
* plan of work
 
* Partnership arrangements
 
* Partnership arrangements
 
* expected contribution, roles,responsibilities of team members
 
* expected contribution, roles,responsibilities of team members
 
* Milestones  
 
* Milestones  
** Biannual reports  
+
** For Biannual reports  
 
** demo/prototype needed 2x (1 proof of concept, 1 use and performance enhanced of decision*making activity)
 
** demo/prototype needed 2x (1 proof of concept, 1 use and performance enhanced of decision*making activity)
 
** Plans for delivery of project results  
 
** Plans for delivery of project results  
 
** Final report
 
** Final report
 +
 +
Project metrics
 +
* Percent of tasks starting/ending as planned
 +
* Number (or percent) of deliverables meeting quality standards
 +
* Integration time of observations/model products into the decision support system
 +
* Delivery time of Earth science products
 +
* Costs for production of value-added products
 +
* Number of iterations to verify data product integration
 +
* Time to correct a problem
 +
* Milestones met ahead of schedule
 +
* Run-time for a decision support system
  
  
 
* Project schedule (1pg)
 
* Project schedule (1pg)

Latest revision as of 07:48, August 12, 2008

Need Integrated system solutions diagram to portray/illustrate our project: http://nasascience.nasa.gov/earth*science/applied*sciences/solicitations/information*to*support*proposals

Proposal summary:

  • Explicitly state which of NASA 8 areas the proposal relates to (if more than 2 identify top 3)
  • how does project respond to priority topic (AQ)

Decision Support:

  • describe activity
  • magangemt, policy, business topic or issue
  • identify end users
  • quantify pre*project baseline

E.S. Research Results:

  • Identify all data products used.

In Tech approach:

  • perceived impact of work
  • objectives and relevance to NASA past/present/future
  • Methodology
  • Systematic approach to integrate E.S. data into DSS and to develop and test integrated system
  • data sharing plan/provide evidence of past data sharing.
  • Approach to quantify improvements in the system performance (risk/uncertainty)
  • approach to quantify socioeconomic value and benefits for resulting improvements
  • key technical, policy, operation and engagement challenges and the approach to address challenges
  • describe tools, system, assessment in detail including decision analysis factors, unique roles for E.S. data and other pertinent info.


Transition Approach:

  • Articulate transition plan

( GEOSS AIP, tutorials with EPA)

Performance Measures:

  • Quantitative/Qualitative measures of outcome, results and value of project

other performance measures:

  • forecast skill scores
  • change in planning time
  • change in response time (e.g. disaster response time)
  • percentage of population served
  • level or certainty/uncertainty in the decision support system
  • false negatives/false positives
  • exposure assessment time and accuracy
  • control measure effectiveness

Anticipated results

  • State quantitative hypothesis
  • estimate expected improvements

Project Management: (2pg)

  • plan of work
  • Partnership arrangements
  • expected contribution, roles,responsibilities of team members
  • Milestones
    • For Biannual reports
    • demo/prototype needed 2x (1 proof of concept, 1 use and performance enhanced of decision*making activity)
    • Plans for delivery of project results
    • Final report

Project metrics

  • Percent of tasks starting/ending as planned
  • Number (or percent) of deliverables meeting quality standards
  • Integration time of observations/model products into the decision support system
  • Delivery time of Earth science products
  • Costs for production of value-added products
  • Number of iterations to verify data product integration
  • Time to correct a problem
  • Milestones met ahead of schedule
  • Run-time for a decision support system


  • Project schedule (1pg)