GEO US 0901a September 2 Telecon

From Earth Science Information Partners (ESIP)
Revision as of 09:48, September 2, 2009 by Rhusar (talk | contribs) (→‎Telecon Discussion)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

< GEO User Requirements for Air Quality | Report | Documents | Resources

Progress Report

  • AQ and Health Report is in phase 4/5/6.
    • Stage 4 Methodology has been augmented based on AG feedback.
      • Earth Observations, EO, are classified into Direct Observations, Derived Products and Models.
      • Users are classified into Raw Data Managers, Analysts, and Decision Makers.
    • Stage 5 Analysing documents
      • Significant new docs provided by the AQ
      • Additional docs from Third World


    • Stage 6 Combining Docs/Draft Report
      • Just started


Plan to have draft report prepared and sent to AG by end of September

Telecon Discussion

  • Friedl: prioritasition in multiple ways is good
  • Friedl: EO reports from GEO need to refs 10 yr implementation Plan
  • Friedl: Send email to CEOS and GEO Sec re participation in AG