Discovery Telecon 2011-11-08

From Earth Science Information Partners (ESIP)
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

<< Back to the Discovery Telecons page

Action Items

  • Hook: Send out a Doodle poll to coordinate testbed requirements telecon
  • Chris, Brian, Hook, Ruth: Send pressure points to Carol and Erin

Attendees

  • Chris Lynnes
  • Curt Tilmes
  • Eric Rozell
  • Hook Hua
  • Carol Meyer
  • Ken Keiser
  • Christine White
  • Jeff Mcwhirter
  • Ruth Duerr
  • Brian Wilson

Agenda

  1. GeoPortal presentation from Christine White
  2. Debrief of EarthCube charette
  3. Status of Winter Session planning
  4. Next Steps for DCP-3

Notes

GeoPortal presentation from Christine White

  • Demo of other organizations that have implemented the Geoportal
  • Is typically customized for each organizations
  • Some Organizations
    • Missouri
    • NOAA (NCDC)
    • EPA
    • NOAA (Interagency Working Group)
    • Lombardia
    • Abu Dhabi (localization capabilities)
    • Internat'l Neuroinformatics Coordinating Facility
  • geoportal.sourceforge.net (open source disribution of Geoportal)
    • Apache license
  • Out of the box functionality
    • Roles: anonymous (search), publishers (contribute services), administrators (reviews publishers contributions)
    • Getting "stuff" into the Geoportal
      • Create metadata manually (out of the box, DC, ISO 19115, other customizable metadata editors)
      • Upload metadata file
      • Register resource on network (put a link to URL, ArcGIS, OAI, THREDDS, etc.)
    • Can you add additional types, such as OpenSearch?
      • OpenSearch falls under the URL Protocol Type
    • Can you differentiate the URL Protocols, e.g., DataCasting, ServiceCasting protocols
      • Would likely require changes to the back-end.
    • What about THREDDS?
      • Getting NCIC metadata from the OPeNDAP endpoint
    • The Federated Search list allows the user to configure the sources used
    • You can also decide how often the Geoportal requests updates from service metadata
    • You can only select up to five sources for federated search
      • Limited for performance reasons with the Geoportal interface
    • Can you expose the query to Geoportal as OpenSearch?
    • The purpose of DataCasting and ServiceCasting is to avoid registration
  • What is the role of a Geoportal testbed for the Discovery cluster?
  • DataCasting and ServiceCasting are seeking aggregators for there casts.
    • Looking to "federate out" the capabilities with casting specs, not seeking a single registry
  • Relies on aggregators to read the metadata, rather than filling out forms for metadata
    • Christine sees the need for OpenSearch based on this aggregator idea
  • Wrap-up for demo
    • Can we set up another telecon for defining requirements of testbeds?
    • The main point is, can OpenSearch casting specs fit in the Geoportal.
    • Hook will set up a Doodle poll for Geoportal drill-down and requirements definition for testbed.
      • We should revisit the RFP for the testbed in this meeting

Debrief of EarthCube charette

  • Multiple ESIP attendees
  • Process was wide open to start, with capabilities defined
  • A full-day spent on barriers to implementing EarthCube capabilities
  • NSF did not discuss how it would like to leverage the things it already funds (NEON, GEON, DataONE, IRIS, etc.)
  • Those with large NSF positions will likely be the ones granted the EAGER grants
  • Significant amount of openness of collaboration
  • ESIP got a lot of positive "play", from members rather than the core committees
  • ESIP has been invited to participate on EAGER proposals
  • Likely to see the large systems argue that EarthCube should be built off of their existing systems
  • NSF likely to fund 5 or 6 EAGER grants
  • Some groups planning on stringing proposals together
  • Tim Killeen will be speaking at winter meeting, likely to leave NSF, no guarantee EarthCube will continue after Tim Killeen is gone
  • Are the EAGER grants part of a "down-select" for future EarthCube proposals?
  • Other programs outside of EarthCube will probably be used to support EarthCube
  • Any feedback or actions for Discovery/ESC from the whitepaper submissions?
    • Next step is to try to get on with EAGER proposal teams
    • Alternatively, try to assemble a Discovery/ESC team that could be plugged into teams closer to NSF
  • Is the outcome of the charrette available yet?
    • Does not look like the two-pagers are posted yet
    • The capabilities list is posted
  • ESIP is trying to avoid competing with its members
    • The best thing for ESIP to do is to enable sharing/exchange of knowledge and technology towards a solution
    • ESIP will not be building something like EarthCube, rather bringing together members to build it
  • The charrettes seemed to be mostly self-serving

Status of Winter Session planning

  • Put out the survey for Winter Sessions
  • Two clear topics stood out
    • Interoperability for OGC services
    • Interoperability for OpenSearch in various types of casting
      • e.g., forming relations between casts
  • Will also probably need a planning session
    • Two sessions allotted for planning and breakout (1.5 hr ea)
    • Should we swap breakout and planning session?
      • It could probably work either way
  • There is still room for more slots
  • Schedule Links:
  • Conflicts
    • Data Preservation
    • ESC
    • Semantic Web demos
  • Brian is willing to run a session on OpenSearch interoperability for types of casting
  • Should the ESC charrette be updated to plenary status?
  • Suggestion:
    • swap breakout and planning session
    • in a less formal capacity, meet to continue breakout work during business meeting
  • Wait on changes for pressure points for 24 hours (may be axing a plenary)
  • Send potential changes and pressure points to Erin

Next Steps for DCP-3