Difference between revisions of "AQ Work Group Telecons"

From Earth Science Information Partners (ESIP)
Line 17: Line 17:
 
* Outline of AQ CoP "[[GEO AQ Community of Practice: Role, Mission, Objectives|Near Term Opportunity]]" document
 
* Outline of AQ CoP "[[GEO AQ Community of Practice: Role, Mission, Objectives|Near Term Opportunity]]" document
 
** Please take a look at and edit the [[GEOSS Relevant AQ Projects]] page.  This is intended as a reference for the NTO and context for the November AQ meeting during the GEO Plenary.  It's not complete yet - several projects need to be added.  Is what is there accurate?
 
** Please take a look at and edit the [[GEOSS Relevant AQ Projects]] page.  This is intended as a reference for the NTO and context for the November AQ meeting during the GEO Plenary.  It's not complete yet - several projects need to be added.  Is what is there accurate?
 +
* ESIP Booth at GEO-VI
 +
** Material to present, handout
 +
** 20X30 poster to hang on booth wall
 +
 
'''Participants:'''
 
'''Participants:'''
 
*  
 
*  

Revision as of 11:46, September 18, 2009

Main ESIP page >> Main AQ Work Group page Previous calls


Note

The ESIP AQ Work Group is currently meeting every other week. These calls alternate with the GEO Architecture Implementation Pilot AQ Working Group's telecons; you can find their telecons here.

September 18, 2009 Telecon

1:30pm EDT
Phone: 866-489-0573;
Meeting Code: *2279431*

Topics (feel free to add an item to the agenda):

  • GEO Communities of Practice
  • Outline of AQ CoP "Near Term Opportunity" document
    • Please take a look at and edit the GEOSS Relevant AQ Projects page. This is intended as a reference for the NTO and context for the November AQ meeting during the GEO Plenary. It's not complete yet - several projects need to be added. Is what is there accurate?
  • ESIP Booth at GEO-VI
    • Material to present, handout
    • 20X30 poster to hang on booth wall

Participants:

Notes:

Previous Calls