Difference between revisions of "AQ Work Group Telecons"

From Earth Science Information Partners (ESIP)
Line 5: Line 5:
 
|}<br />
 
|}<br />
  
== September 5, 2008 Telecon ==
+
== September 19, 2008 Telecon ==
 
1:30pm EST <br>   
 
1:30pm EST <br>   
 
Phone: 866-489-0573;<br>
 
Phone: 866-489-0573;<br>
Line 13: Line 13:
  
 
* OGC GEOSS Architecture Implementation Pilot Coordination
 
* OGC GEOSS Architecture Implementation Pilot Coordination
** [http://www.ogcnetwork.net/node/402#AQ CFP Response Summary]
+
** [[GEOSS_AIP_Air_Quality|GEO AIP Workspace]] to be transferred (at least in part) to the [http://www.ogcnetwork.net/node/407|ogcnetwork.net page]
** [http://www.ogcnetwork.net/AIP_Phase2_Kickoff AIP Kick-off]
+
** Analysis of [[AIP CFP AQ Responses]]
** AQ SBA Points-of-Contact: David McCabe, Frank Lindsay, Stefan Falke, Rudy Husar, others?
 
 
 
 
 
[[AIP CFP AQ Responses]]
 
 
 
Participants
 
David McCabe
 
Barry Herchenrodder
 
Stefan Falke
 
 
 
Barry: Might want to look into having the CMAQ be part of the AIP.
 

Revision as of 06:37, September 17, 2008

Main ESIP page >> Main Cluster page Previous calls


September 19, 2008 Telecon

1:30pm EST
Phone: 866-489-0573;
Meeting Code: *2279431*

Topics (feel free to add your ideas):