Difference between revisions of "AQ Work Group Telecons"

From Earth Science Information Partners (ESIP)
Line 13: Line 13:
  
 
* OGC GEOSS Architecture Implementation Pilot Coordination
 
* OGC GEOSS Architecture Implementation Pilot Coordination
** [[GEOSS_AIP_Air_Quality|GEO AIP Workspace]] to be transferred (at least in part) to the [http://www.ogcnetwork.net/node/407 |ogcnetwork page]
+
** [[GEOSS_AIP_Air_Quality|GEO AIP Workspace]] to be transferred (at least in part) to the [[http://www.ogcnetwork.net/node/407 |ogcnetwork page]]
 
** Analysis of [[AIP CFP AQ Responses]]
 
** Analysis of [[AIP CFP AQ Responses]]

Revision as of 06:39, September 17, 2008

Main ESIP page >> Main Cluster page Previous calls


September 19, 2008 Telecon

1:30pm EST
Phone: 866-489-0573;
Meeting Code: *2279431*

Topics (feel free to add your ideas):