Difference between revisions of "AQ Work Group Telecons"

From Earth Science Information Partners (ESIP)
Line 17: Line 17:
 
***co-development of GEOSS AQ Portal
 
***co-development of GEOSS AQ Portal
 
***travel to GEO Summit in November to introduce and report on the GEOSS AQ Committee of Practice
 
***travel to GEO Summit in November to introduce and report on the GEOSS AQ Committee of Practice
 +
***AQ network interoperability grants
 
* Cluster contribution to [http://www.ogcnetwork.net/AIpilot OGC GEOSS Architecture Implementation Pilot]
 
* Cluster contribution to [http://www.ogcnetwork.net/AIpilot OGC GEOSS Architecture Implementation Pilot]
 
**Community components (portal, catalog, dataspaces)
 
**Community components (portal, catalog, dataspaces)
 
**Liaison, tech support for assisting organizations and projects in connecting with GEOSS architecture
 
**Liaison, tech support for assisting organizations and projects in connecting with GEOSS architecture
***AQ network interoperability grants
 
 
* AQ Cluster as GEOSS Community of Practice
 
* AQ Cluster as GEOSS Community of Practice
 
**draft a [[AQCluster_Charter|Charter Statement]] to provide an introduction to the Cluster for new participants
 
**draft a [[AQCluster_Charter|Charter Statement]] to provide an introduction to the Cluster for new participants
 
* AQ ontology derived from building an AQ network
 
* AQ ontology derived from building an AQ network
 
** see [http://epadata.wik.is/Ken_Orr_Special_Session_August_7,_2008 hydrology ontology created by Water Management Cluster]
 
** see [http://epadata.wik.is/Ken_Orr_Special_Session_August_7,_2008 hydrology ontology created by Water Management Cluster]

Revision as of 05:23, August 8, 2008

Main ESIP page >> Main Cluster page Previous calls


August 8, 2008 Telecon

1:30pm EST
Phone: 866-489-0573;
Meeting Code: *2279431*

Topics (feel free to add your ideas):

  • AQ Cluster FY09 Budget
    • Submit budget to ESIP Finance & Approporations Committee by Aug 15
    • Possible items
      • co-development of GEOSS AQ Portal
      • travel to GEO Summit in November to introduce and report on the GEOSS AQ Committee of Practice
      • AQ network interoperability grants
  • Cluster contribution to OGC GEOSS Architecture Implementation Pilot
    • Community components (portal, catalog, dataspaces)
    • Liaison, tech support for assisting organizations and projects in connecting with GEOSS architecture
  • AQ Cluster as GEOSS Community of Practice
    • draft a Charter Statement to provide an introduction to the Cluster for new participants
  • AQ ontology derived from building an AQ network