Difference between revisions of "AQ SBA Pilot Intro"

From Earth Science Information Partners (ESIP)
Line 2: Line 2:
  
  
There will be 5 min [[Media:AQAIP_Intro.ppt|AQ SBA Pilot introduction at the AIP]]. I am proposing 3 slides:
+
There will be 5 min '''[[Media:AQAIP_Intro.ppt|AQ SBA Pilot introduction PPT]]''' at the AIP. I am proposing 3 slides:
  
 
* 1. [[GEOSS_AIP_AQ_Scenario]] AQ SBA scenario based on McCabe-Keating ..   
 
* 1. [[GEOSS_AIP_AQ_Scenario]] AQ SBA scenario based on McCabe-Keating ..   

Revision as of 12:59, September 23, 2008

AQ AIP workspace


There will be 5 min AQ SBA Pilot introduction PPT at the AIP. I am proposing 3 slides:

The contents of 1 and 2 can be extracted from the available materials. However, slide 3 could use input from yourself and from the other participants.

There is a wiki page where we have an Expectations_from_AIP-2 wish list from Stefan and myself. A very simple, short list of AIP-2 expectations from David McCabe-TKeating, Frank Lindsey and other AIP participants would be most helpful. It would give us a head start toward building a consensus one desired outcome.