Semantic Web Telecons

From Earth Science Information Partners (ESIP)


Telecons

Main ESIP page >> Main Cluster page Previous calls


1100 PT/ 1200 MT/ 1300 CT/ 1400 ET/ 1900 UT
Phone: 800-508-7631 (international call in: 334-323-3031)
Meeting Code: *8202307*

January 25, 2011 Telecon

  • Review of ESIP Winter Semantic Web Tutorial (Peter, Chris, Hook, Rob)
    • Evaluation
    • Relation to NASA Tech Infusion activities and goals
    • Relation to SW testbed and requirements on the testbed
    • Same form or others (e.g. Expert Panel, etc.)
    • Where and when next?
  • Using the http://esipfed.org/ site for dereferencible ontology IRIs. (Chris L)
  • Continuation of Data-Type and Service ontology work (Peter)
  • Ontology development to support 'casting' (Brian)
  • Summer meeting theme data and information quality - and possible quality ontology work session
  • Other topics?
    • Utopia uses semantic services to annotate PDFs, but is focused on biomed. Needs earth science add-ons. Check it out at http://www.utopiadocs.com/documents/ Looking to create a PDF-based poster archive for ESIP with Utopia-like interface. (Bruce C)
  • Time - 4pm ET

November 22, 2010 Telecon

  • Attending (2pm ET)
    • Peter, Chris, Hook, Yuqi, Rob, Steve, bhaskar, kai, Erin ?
  • Short description of Test Bed
    • We went over the slides from Chris's presentation
    • http://testbed.gmu.edu/s​wtestbed/
    • Ontology development / engineering?
    • Obtain instance data from Chris L. and Petr V.
    • Rob, Kai, for reviewing ontology and next level of engineering (RDFS or OWL) with Chris (consult)
  • Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
  • Decision on presenters for each component
      • Intro - Peter 10min
      • Use case - Chris - 20 mins
      • Model/ ontology - Peter and Rob - 1 hr
      • Model/ ontology - Peter and Rob - 10 min
      • Materialization - Rahul and Peter - 1 hr
      • Summary/ eval - Chris and Hook - 10 min
      • Application definition - Rahul and Peter (temp) - 70 min
      • Application/query development - reduce (Hook) - 1hr
      • Summary Peter - 20 mins
      • Final eval - Chris and Hook - 10 mins
  • Time line for content development and review.
    • three weeks, i.e. before AGU meeting
    • Peter to send around summaries
  • Need for another telecon before ESIP
    • possible short call in the week of Dec 20th...
  • Rob asked for any requests for next year's test bed (continuation or new, e.g. Drupal 7)

July 28, 2009 Telecon

Recommendations for Semantic Web Markup of Existing XML

Requirements for Products and Services Testbed

Storage of triples, SPARQL query testing

June 23, 2009 Telecon

no telecon - we are all writing proposals

May 26, 2009 Telecon

no telecon - AGU meeting

February 24, 2009 Telecon

Topics (feel free to add your ideas):

  • ESIP participation in ontology development
    • veting and getting feedback on specific developments for the data-type ontology
      • Data Ontology (CMAPS public server: IHMC Public CMAPS (3)/ user/ESIP-Semantic Web/Data Ontology/SAM_ontology_latest_1_9_01b)
        • Address specific questions: Under StructuralRepresentationType. Should we remove DimensionalRepresentationType class since Map, Raster and Vector are also 1 or 2 dimensional in structure. Spectrum and Timeseries could be subclasses of Vector.
        • Need to add instances for specific concepts
    • discussing how it will be used in a demo