Difference between revisions of "Telecon 02.28.13 materials"
From Earth Science Information Partners (ESIP)
Anne Wilson (talk | contribs) |
Anne Wilson (talk | contribs) |
||
Line 3: | Line 3: | ||
== Accomplished this month == | == Accomplished this month == | ||
− | * | + | *Data life cycle model identified |
**goal: identify, constrain scope of survey | **goal: identify, constrain scope of survey | ||
**a linear model, but feedback loops are implied | **a linear model, but feedback loops are implied | ||
− | * | + | *A diagram showing [http://wiki.esipfed.org/images/e/e9/Data_life_cycle_activities_and_concerns.pdf data life cycle model, activites, concerns, perspectives] |
− | * | + | *An instance of that diagram with [http://wiki.esipfed.org/images/9/9d/Committee_on_the_Preservation_of_Geoscience_Data_and_Collections_report_mapping_to_data_life_cycle.pdf highlights showing categories covered by one article from the literature review list] for the Report from the Committee on Preservation of Geoscience Data and Collections |
− | *a document with a straw man framework for article evaluation | + | *a document with [http://wiki.esipfed.org/images/0/03/Eval_framework_applied_to_RCPGDC.pdf a straw man framework for article evaluation] for the Report from the Committee on Preservation of Geoscience Data and Collections |
== Literature review == | == Literature review == |
Revision as of 11:35, February 28, 2013
Plans for February 28, 2013 telecon
Accomplished this month
- Data life cycle model identified
- goal: identify, constrain scope of survey
- a linear model, but feedback loops are implied
- A diagram showing data life cycle model, activites, concerns, perspectives
- An instance of that diagram with highlights showing categories covered by one article from the literature review list for the Report from the Committee on Preservation of Geoscience Data and Collections
- a document with a straw man framework for article evaluation for the Report from the Committee on Preservation of Geoscience Data and Collections
Literature review
- Clarify Goals
- Review "article review framework" for ability to meet those goals
- Look at article list, discuss list membership (what, if any, new articles should we add? by what criteria?)
Our working group goals
- Overall
- July goals
- December goals
"Plans are useless, but planning is essentail." -Eisenhower
Steps for March
TBD