Difference between revisions of "Semantic Web Telecons"

From Earth Science Information Partners (ESIP)
Line 12: Line 12:
 
Phone: 800-508-7631  (international call in:  334-323-3031) <br>
 
Phone: 800-508-7631  (international call in:  334-323-3031) <br>
 
Meeting Code: *8202307* <br>
 
Meeting Code: *8202307* <br>
 +
 +
 +
== February 22, 2011 Telecon ==
 +
 +
* tentative
  
 
== January 25, 2011 Telecon ==
 
== January 25, 2011 Telecon ==
Line 28: Line 33:
 
**Utopia uses semantic services to annotate PDFs, but is focused on biomed. Needs earth science add-ons. Check it out at http://www.utopiadocs.com/documents/  Looking to create a PDF-based poster archive for ESIP with Utopia-like interface.  NEW:  If this is of any interest to you, I'll spin up a Basecamp site. so email me  [bruce at tnms.org] and I'll sign you up. Here is another resource from bio-med land.  http://code.google.com/p/annotation-ontology/ (Bruce C)
 
**Utopia uses semantic services to annotate PDFs, but is focused on biomed. Needs earth science add-ons. Check it out at http://www.utopiadocs.com/documents/  Looking to create a PDF-based poster archive for ESIP with Utopia-like interface.  NEW:  If this is of any interest to you, I'll spin up a Basecamp site. so email me  [bruce at tnms.org] and I'll sign you up. Here is another resource from bio-med land.  http://code.google.com/p/annotation-ontology/ (Bruce C)
 
* Time - 4pm ET
 
* Time - 4pm ET
 +
 +
[[SWTeleconNotes20110115]]
  
 
== November 22, 2010 Telecon==
 
== November 22, 2010 Telecon==
  
* Attending (2pm ET)
+
* 2pm ET
** Peter, Chris, Hook, Yuqi, Rob, Steve, bhaskar, kai, Erin ?
 
 
 
 
* Short description of Test Bed
 
* Short description of Test Bed
** We went over the slides from Chris's [[Media:ESDSWG_M9_ESIP_Triples_Project_Lynnes.ppt|presentation]]
 
** http://testbed.gmu.edu/s​wtestbed/
 
** Ontology development / engineering?
 
** Obtain instance data from Chris L. and Petr V.
 
** Rob, Kai, for reviewing ontology and next level of engineering (RDFS or OWL) with Chris (consult)
 
 
* Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
 
* Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
** We went over the summary information from ESDSWG 2010 [[Media:ESIPWinter2011TestbedTutorialRevised20111122.ppt|revised slides]]
 
** Metric, value - Chris, Hook. http://wiki.esipfed.org/​index.php/Assessing_Impa​ct_From_Workshops
 
** Length - 3 hr blocks, 1 1/2 hr each
 
** Content (with 10 mins at end of each major session for summary questionnaire/ evaluation)
 
*** Minimize homonym problem - identify not solve.
 
*** We dropped the more advanced application development
 
 
* Decision on presenters for each component
 
* Decision on presenters for each component
*** Intro - Peter 10min
 
*** Use case - Chris - 20 mins
 
*** Model/ ontology - Peter and Rob - 1 hr
 
*** Model/ ontology - Peter and Rob - 10 min
 
*** Materialization - Rahul and Peter - 1 hr
 
*** Summary/ eval - Chris and Hook - 10 min
 
*** Application definition - Rahul and Peter (temp) - 70 min
 
*** Application/query development - reduce (Hook) - 1hr
 
*** Summary Peter - 20 mins
 
*** Final eval - Chris and Hook - 10 mins
 
 
 
* Time line for content development and review.
 
* Time line for content development and review.
** three weeks, i.e. before AGU meeting
 
** Peter to send around summaries
 
 
* Need for another telecon before ESIP
 
** possible short call in the week of Dec 20th...
 
 
* Rob asked for any requests for next year's test bed (continuation or new, e.g. Drupal 7)
 
 
== July 28, 2009 Telecon ==
 
[[Recommendations for Semantic Web Markup of Existing XML]]
 
 
Requirements for Products and Services Testbed
 
:Storage of triples, SPARQL query testing
 
 
== June 23, 2009 Telecon ==
 
no telecon - we are all writing proposals
 
 
== May 26, 2009 Telecon ==
 
no telecon - AGU meeting
 
 
== February 24, 2009 Telecon ==
 
 
 
Topics (feel free to add your ideas):
 
  
* ESIP participation in ontology development
+
[[SWTeleconNotes20101122]]
** veting and getting feedback on specific developments for the data-type ontology
 
*** Data Ontology (CMAPS public server: IHMC Public CMAPS (3)/ user/ESIP-Semantic Web/Data Ontology/SAM_ontology_latest_1_9_01b)
 
**** Address specific questions: Under StructuralRepresentationType. Should we remove DimensionalRepresentationType class since Map, Raster and Vector are also 1 or 2 dimensional in structure. Spectrum and Timeseries could be subclasses of Vector.
 
**** Need to add instances for specific concepts
 
** discussing how it will be used in a demo
 

Revision as of 12:09, January 26, 2011


Telecons

Main ESIP page >> Main Cluster page Previous calls


1100 PT/ 1200 MT/ 1300 CT/ 1400 ET/ 1900 UT
Phone: 800-508-7631 (international call in: 334-323-3031)
Meeting Code: *8202307*


February 22, 2011 Telecon

  • tentative

January 25, 2011 Telecon

  • Review of ESIP Winter Semantic Web Tutorial (Peter, Chris, Hook, Rob)
    • Evaluation
    • Relation to NASA Tech Infusion activities and goals
    • Relation to SW testbed and requirements on the testbed
    • Same form or others (e.g. Expert Panel, etc.)
    • Where and when next?
  • Using the http://esipfed.org/ site for dereferencible ontology IRIs. (Chris L)
  • Continuation of Data-Type and Service ontology work (Peter)
  • Ontology development to support 'casting' (Brian)
  • Summer meeting theme data and information quality - and possible quality ontology work session
  • Other topics?
    • Utopia uses semantic services to annotate PDFs, but is focused on biomed. Needs earth science add-ons. Check it out at http://www.utopiadocs.com/documents/ Looking to create a PDF-based poster archive for ESIP with Utopia-like interface. NEW: If this is of any interest to you, I'll spin up a Basecamp site. so email me [bruce at tnms.org] and I'll sign you up. Here is another resource from bio-med land. http://code.google.com/p/annotation-ontology/ (Bruce C)
  • Time - 4pm ET

SWTeleconNotes20110115

November 22, 2010 Telecon

  • 2pm ET
  • Short description of Test Bed
  • Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
  • Decision on presenters for each component
  • Time line for content development and review.

SWTeleconNotes20101122