Difference between revisions of "Water Cluster Participation in GEOSS AIP-3"

From Earth Science Information Partners (ESIP)
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
The Global Earth Observations System of Systems (GEOSS) Architecture Implementation Pilot 3 (AIP-3) process is moving forward rapidly.  The next step is submission of brief preliminary proposal or “kick off” responses to the AIP-3 process.  The application template and the description of the Water Related scenerios are provided here. Submissions are due by March 3 and should be sent to George Percivall at OGC>
+
The Global Earth Observations System of Systems (GEOSS) Architecture Implementation Pilot 3 (AIP-3) process is moving forward rapidly.  The next step is submission of brief preliminary proposal or “kick off” responses to the AIP-3 process.  The application template and the description of the Water Related scenerios are provided here. Submissions are due by March 3 and should be sent to George Percivall at OGC (or Will Pozzi). Please keep Bill Sonntag and/or ESIP staff (carolbmeyer@esipfed.org or brogan@esipfed.org) apprised of your intent as there may be opportunities to partner with others wanting to do a submission.
  
 
*[[media: 200202_cfp_aip3_wq_scen-1.pdf |Water Quality Scenario]] <br/>
 
*[[media: 200202_cfp_aip3_wq_scen-1.pdf |Water Quality Scenario]] <br/>
 
*[[media: AIP3_Architecture_Drought_Scenario_Clarification.pdf |Drought Scenario]] <br/>
 
*[[media: AIP3_Architecture_Drought_Scenario_Clarification.pdf |Drought Scenario]] <br/>
 
*[[media: AIP3_CFP_Reponse_Template.pdf |Use Case Template]] <br/>
 
*[[media: AIP3_CFP_Reponse_Template.pdf |Use Case Template]] <br/>

Latest revision as of 06:18, May 10, 2010

The Global Earth Observations System of Systems (GEOSS) Architecture Implementation Pilot 3 (AIP-3) process is moving forward rapidly. The next step is submission of brief preliminary proposal or “kick off” responses to the AIP-3 process. The application template and the description of the Water Related scenerios are provided here. Submissions are due by March 3 and should be sent to George Percivall at OGC (or Will Pozzi). Please keep Bill Sonntag and/or ESIP staff (carolbmeyer@esipfed.org or brogan@esipfed.org) apprised of your intent as there may be opportunities to partner with others wanting to do a submission.