Difference between revisions of "ESC Four-Track Approach"
From Earth Science Information Partners (ESIP)
Line 4: | Line 4: | ||
# Programmatic | # Programmatic | ||
# User Stories | # User Stories | ||
− | == ESIP Winter | + | == Planning Meeting at ESIP Winter 2012 == |
− | At the ESIP Winter meeting in 2012, a session will be held to flesh out these areas. The agenda will be as follows: | + | At the ESIP Winter meeting in 2012, a session will be held on [[January_4,_2012|Wednesday, January 4]] to flesh out these areas. The agenda will be as follows: |
# Brief intro (Lynnes, 5 min) | # Brief intro (Lynnes, 5 min) | ||
# Define a mode for coordinating the four tracks (Moderator=Lynnes, 30 min) | # Define a mode for coordinating the four tracks (Moderator=Lynnes, 30 min) |
Revision as of 12:21, December 28, 2011
At an ESIP ESC Cluster meeting, Hook Hua pointed out that there were things to be done in four separate areas:
- Technical
- Sociological
- Programmatic
- User Stories
Planning Meeting at ESIP Winter 2012
At the ESIP Winter meeting in 2012, a session will be held on Wednesday, January 4 to flesh out these areas. The agenda will be as follows:
- Brief intro (Lynnes, 5 min)
- Define a mode for coordinating the four tracks (Moderator=Lynnes, 30 min)
- How to schedule telecons?
- Single-track telecons or cover more than one track?
- Discuss main activities, recruit members and coordinators (at least 2) for each area (20 min)
- Proposed roles of track coordinators
- Setup and run telecons for the track
- Coordinate with other ESC tracks on topics and schedules
- Ensure output of tracks is captured in ESIP Wiki
- Sociological (Lynnes)
- Technical (Law, Hua)
- Programmatic (Seablom?)
- User Stories (Wee, Kuo)
- Proposed roles of track coordinators
- Upcoming plans (Lynnes, plus suggestions from the floor) (40 min)
- User Story from Udaysankar Nair
- WebEx Hackathon at/with/on EuroGEOSS Broker