Difference between revisions of "Semantic Web Telecons"
From Earth Science Information Partners (ESIP)
Line 14: | Line 14: | ||
== November 22, 2010 Telecon== | == November 22, 2010 Telecon== | ||
+ | |||
+ | * Attending (2pm ET) | ||
+ | ** Peter, Chris, Hook, Yuqi, Rob, Steve, bhaskar, kai, Erin ? | ||
* Short description of Test Bed | * Short description of Test Bed | ||
+ | ** We went over the slides from Chris's [[Media:ESDSWG_M9_ESIP_Triples_Project_Lynnes.ppt|presentation]] | ||
+ | ** http://testbed.gmu.edu/swtestbed/ | ||
+ | ** Ontology development / engineering? | ||
+ | ** Obtain instance data from Chris L. and Petr V. | ||
+ | ** Rob, Kai, for reviewing ontology and next level of engineering (RDFS or OWL) with Chris (consult) | ||
* Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP | * Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP | ||
+ | ** We went over the summary information from ESDSWG 2010 [[Media:ESIPWinter2011TestbedTutorialRevised20111122.ppt|revised slides]] | ||
+ | ** Metric, value - Chris, Hook. http://wiki.esipfed.org/index.php/Assessing_Impact_From_Workshops | ||
+ | ** Length - 3 hr blocks, 1 1/2 hr each | ||
+ | ** Content (with 10 mins at end of each major session for summary questionnaire/ evaluation) | ||
+ | *** Minimize homonym problem - identify not solve. | ||
+ | *** We dropped the more advanced application development | ||
* Decision on presenters for each component | * Decision on presenters for each component | ||
+ | *** Intro - Peter 10min | ||
+ | *** Use case - Chris - 20 mins | ||
+ | *** Model/ ontology - Peter and Rob - 1 hr | ||
+ | *** Model/ ontology - Peter and Rob - 10 min | ||
+ | *** Materialization - Rahul and Peter - 1 hr | ||
+ | *** Summary/ eval - Chris and Hook - 10 min | ||
+ | *** Application definition - Rahul and Peter (temp) - 70 min | ||
+ | *** Application/query development - reduce (Hook) - 1hr | ||
+ | *** Summary Peter - 20 mins | ||
+ | *** Final eval - Chris and Hook - 10 mins | ||
+ | |||
* Time line for content development and review. | * Time line for content development and review. | ||
+ | ** three weeks, i.e. before AGU meeting | ||
+ | ** Peter to send around summaries | ||
+ | |||
* Need for another telecon before ESIP | * Need for another telecon before ESIP | ||
+ | ** possible short call in the week of Dec 20th... | ||
+ | |||
+ | * Rob asked for any requests for next year's test bed (continuation or new, e.g. Drupal 7) | ||
== July 28, 2009 Telecon == | == July 28, 2009 Telecon == |
Revision as of 14:08, November 22, 2010
Telecons
Main ESIP page >> Main Cluster page | Previous calls |
1100 PT/ 1200 MT/ 1300 CT/ 1400 ET/ 1900 UT
Phone: 800-508-7631 (international call in: 334-323-3031)
Meeting Code: *8202307*
November 22, 2010 Telecon
- Attending (2pm ET)
- Peter, Chris, Hook, Yuqi, Rob, Steve, bhaskar, kai, Erin ?
- Short description of Test Bed
- We went over the slides from Chris's presentation
- http://testbed.gmu.edu/swtestbed/
- Ontology development / engineering?
- Obtain instance data from Chris L. and Petr V.
- Rob, Kai, for reviewing ontology and next level of engineering (RDFS or OWL) with Chris (consult)
- Review of ESIP Winter Tutorial Syllabus and timing/ scheduling at ESIP
- We went over the summary information from ESDSWG 2010 revised slides
- Metric, value - Chris, Hook. http://wiki.esipfed.org/index.php/Assessing_Impact_From_Workshops
- Length - 3 hr blocks, 1 1/2 hr each
- Content (with 10 mins at end of each major session for summary questionnaire/ evaluation)
- Minimize homonym problem - identify not solve.
- We dropped the more advanced application development
- Decision on presenters for each component
- Intro - Peter 10min
- Use case - Chris - 20 mins
- Model/ ontology - Peter and Rob - 1 hr
- Model/ ontology - Peter and Rob - 10 min
- Materialization - Rahul and Peter - 1 hr
- Summary/ eval - Chris and Hook - 10 min
- Application definition - Rahul and Peter (temp) - 70 min
- Application/query development - reduce (Hook) - 1hr
- Summary Peter - 20 mins
- Final eval - Chris and Hook - 10 mins
- Time line for content development and review.
- three weeks, i.e. before AGU meeting
- Peter to send around summaries
- Need for another telecon before ESIP
- possible short call in the week of Dec 20th...
- Rob asked for any requests for next year's test bed (continuation or new, e.g. Drupal 7)
July 28, 2009 Telecon
Recommendations for Semantic Web Markup of Existing XML
Requirements for Products and Services Testbed
- Storage of triples, SPARQL query testing
June 23, 2009 Telecon
no telecon - we are all writing proposals
May 26, 2009 Telecon
no telecon - AGU meeting
February 24, 2009 Telecon
Topics (feel free to add your ideas):
- ESIP participation in ontology development
- veting and getting feedback on specific developments for the data-type ontology
- Data Ontology (CMAPS public server: IHMC Public CMAPS (3)/ user/ESIP-Semantic Web/Data Ontology/SAM_ontology_latest_1_9_01b)
- Address specific questions: Under StructuralRepresentationType. Should we remove DimensionalRepresentationType class since Map, Raster and Vector are also 1 or 2 dimensional in structure. Spectrum and Timeseries could be subclasses of Vector.
- Need to add instances for specific concepts
- Data Ontology (CMAPS public server: IHMC Public CMAPS (3)/ user/ESIP-Semantic Web/Data Ontology/SAM_ontology_latest_1_9_01b)
- discussing how it will be used in a demo
- veting and getting feedback on specific developments for the data-type ontology