Difference between revisions of "GEOSS AIP Air Quality"

From Earth Science Information Partners (ESIP)
 
(24 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
__NOTOC__
 +
{| width="100%" cellpadding="0" cellspacing="0" style="zborder-top:1px solid #aaaaaa; border-collapse: collapse;"
 +
|- align="center" valign="top"
 +
|style="border: 0px solid gray;" "text-align:center" |[[Image:GEOSS Arch Workshop.png|600px]]
 +
<center> This is a temporary workspace for the <big>'''GEOSS AIP Air Quality Scenario''' </big> | The [http://www.ogcnetwork.net/node/407 OGCNetwork site] is now being used. </center>
 +
<center> The session is being co-lead by: Stefan Falke, Northrop Grumman; Rudy Husar, Washington University; Frank Lindsay, NASA; David McCabe, EPA; </center> <br>
 +
|}
 
{| width="100%" cellpadding="0" cellspacing="0" style="zborder-top:1px solid #aaaaaa; border-collapse: collapse;"  
 
{| width="100%" cellpadding="0" cellspacing="0" style="zborder-top:1px solid #aaaaaa; border-collapse: collapse;"  
 
|- valign="top" bgcolor="#FFFFFF"
 
|- valign="top" bgcolor="#FFFFFF"
 
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="50%"|
 
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="50%"|
 
===What's New===
 
===What's New===
 +
* 2008-09-20: [[AQ SBA Pilot Intro]] slides 
 +
* 2008-09-16: [http://www.ogcnetwork.net/AIPtelecons GEOSS AIP Telecon]
 +
* 2008-09-16: Participants [[Expectations from AIP-2]]
 +
* 2008-09-16: [[AIP_AQ_Coordination_Sandbox | AIP AQ Coordination Sandbox]]
 +
* 2008-09-15: [[AIP_CFP_AQ_Responses| AQ Responses to the AIP_CFP]]
 
* 2008-09-15: Set up workspace for GEOSS AIP AQ Scenario
 
* 2008-09-15: Set up workspace for GEOSS AIP AQ Scenario
 
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="50%"|
 
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="50%"|
 +
 
=== Participants ===
 
=== Participants ===
 
* Primary Participants: EPA, ESIP AQ Cluster, ICT4EO, ISPRA, Northrop Grumman, VIEWS, Washington Univ
 
* Primary Participants: EPA, ESIP AQ Cluster, ICT4EO, ISPRA, Northrop Grumman, VIEWS, Washington Univ
Line 11: Line 24:
 
{| width="100%" cellpadding="0" cellspacing="0" style="zborder-top:1px solid #aaaaaa; border-collapse: collapse;"  
 
{| width="100%" cellpadding="0" cellspacing="0" style="zborder-top:1px solid #aaaaaa; border-collapse: collapse;"  
 
|- valign="top" bgcolor="#FFFFFF"
 
|- valign="top" bgcolor="#FFFFFF"
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="33%"|
+
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="50%"|
 +
=== Session Agenda===
 +
*AIP AQ Societal Benefit Area Overview (2-3 minutes)
 +
*Short (5 min. each) presentations by primary participants (35 minutes)
 +
**participant objectives and envisioned role in AIP-2
 +
**services, data, components and other inputs
 +
**participant's expectation, desired outcome from AIP-2
 +
*Introductions (1-2 min. each) from contributing participants (10-15 min.)
 +
*Defining AQ SBA objectives for AIP-2  (30 minutes)
 +
**Interfacing with GEOSS Common Infrastructure
 +
**AQ Community Components
 +
**Scenario(s)
 +
*Next steps and plan (10 minutes)
 +
**Approach to communication, coordination and collaboration
 +
**review AIP-2 Master Schedule
 +
**identify session specific milestones
 +
**What is missing and still needed: service and data gaps
 +
 
 +
 
 +
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="50%"|
 +
 
 
===Resources ===
 
===Resources ===
 +
'''[http://www.ogcnetwork.net/AIpilot GEOSS Architecture Implementation Pilot]''' <br>
 +
'''[[GEOSS_AIP_AQ_Scenario| GEOSS AIP AQ Scenario Development]]''' <br>
 +
'''[http://www.ogcnetwork.net/AIPphase2CFP AIP CFP]'''<br>
 +
'''[[AIP_CFP_AQ_Responses|AQ Responses to CFP]] | [http://www.ogcnetwork.net/node/395 All Responses]''' <br>
 +
'''[http://www.ogcnetwork.net/AIP_Phase2_Kickoff AIP Kickoff]''' <br>
 +
'''[[AIP AQ Coordination Sandbox]]<br><br>
 +
'''[http://www.ogcnetwork.net/node/407 Page on OGCNetwork.net]'''<br><br>
 +
'''[[Talk:GEOSS_AIP_Air_Quality | Discussion for AQ Scenario]]
 +
 
{{Template:GEO Links}}<br>
 
{{Template:GEO Links}}<br>
{{Template:GEOSS Committees}}<br>
 
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="33%"|
 
=== Session Agenda===
 
|bgcolor="#FFFFFF" style="border: 1px solid gray;padding-left:0.5em;padding-right:0.5em;" width="33%"|
 
=== Topics===
 
* Air Quality and Human Health
 
* Proposing formation of a GEOSS Air Quality Community of  Practice
 
* Wildland fire example
 
* AIRNow system proposed with interoperable interfaces
 
* user-defined areas for selected variables calculated by WPS
 
* SensorWeb which might apply best to AirQuality if the air sensors
 
* State of environment, emissions, and human health.
 
* intercontinental pollutant transport model
 
* Decision system pattern for AQ
 
* Global surfaces of population counts, densities, and quality measure of population-weighted mean geographic unit area, at two scales.
 
* Development of RM-ODP viewpoint descriptions
 
 
 
|}
 
|}

Latest revision as of 11:37, September 21, 2008

GEOSS Arch Workshop.png
This is a temporary workspace for the GEOSS AIP Air Quality Scenario | The OGCNetwork site is now being used.
The session is being co-lead by: Stefan Falke, Northrop Grumman; Rudy Husar, Washington University; Frank Lindsay, NASA; David McCabe, EPA;

What's New

Participants

  • Primary Participants: EPA, ESIP AQ Cluster, ICT4EO, ISPRA, Northrop Grumman, VIEWS, Washington Univ
  • Contributing Participants: CIESIN, Compusult, ESA, ESRI, GOES-R and GMU, INCOSE, NASA World Wind, NOAA NCDC GOSIC, NOAA SNAAP

Session Agenda

  • AIP AQ Societal Benefit Area Overview (2-3 minutes)
  • Short (5 min. each) presentations by primary participants (35 minutes)
    • participant objectives and envisioned role in AIP-2
    • services, data, components and other inputs
    • participant's expectation, desired outcome from AIP-2
  • Introductions (1-2 min. each) from contributing participants (10-15 min.)
  • Defining AQ SBA objectives for AIP-2 (30 minutes)
    • Interfacing with GEOSS Common Infrastructure
    • AQ Community Components
    • Scenario(s)
  • Next steps and plan (10 minutes)
    • Approach to communication, coordination and collaboration
    • review AIP-2 Master Schedule
    • identify session specific milestones
    • What is missing and still needed: service and data gaps


Resources

GEOSS Architecture Implementation Pilot
GEOSS AIP AQ Scenario Development
AIP CFP
AQ Responses to CFP | All Responses
AIP Kickoff
AIP AQ Coordination Sandbox

Page on OGCNetwork.net

Discussion for AQ Scenario

GEO: Home | About | Chairs Letter | Meetings | Brochure | Documents