Difference between revisions of "Telecon 02.28.13 materials"

From Earth Science Information Partners (ESIP)
Line 3: Line 3:
  
 
== Accomplished this month ==
 
== Accomplished this month ==
*data life cycle model identified
+
*Data life cycle model identified
 
**goal: identify, constrain scope of survey
 
**goal: identify, constrain scope of survey
 
**a linear model, but feedback loops are implied
 
**a linear model, but feedback loops are implied
*a diagram showing data life cycle model, activites, concerns, perspectives
+
*A diagram showing   [http://wiki.esipfed.org/images/e/e9/Data_life_cycle_activities_and_concerns.pdf data life cycle model, activites, concerns, perspectives]
*an instance of that diagram with highlights showing categories covered by one article from the literature review list
+
*An instance of that diagram with [http://wiki.esipfed.org/images/9/9d/Committee_on_the_Preservation_of_Geoscience_Data_and_Collections_report_mapping_to_data_life_cycle.pdf highlights showing categories covered by one article from the literature review list] for the Report from the Committee on Preservation of Geoscience Data and Collections
*a document with a straw man framework for article evaluation
+
*a document with [http://wiki.esipfed.org/images/0/03/Eval_framework_applied_to_RCPGDC.pdf a straw man framework for article evaluation] for the Report from the Committee on Preservation of Geoscience Data and Collections
  
 
== Literature review ==
 
== Literature review ==

Revision as of 11:35, February 28, 2013

Plans for February 28, 2013 telecon

Accomplished this month

Literature review

  • Clarify Goals
  • Review "article review framework" for ability to meet those goals
  • Look at article list, discuss list membership (what, if any, new articles should we add? by what criteria?)

Our working group goals

  • Overall
  • July goals
  • December goals

"Plans are useless, but planning is essentail." -Eisenhower

Steps for March

TBD