Difference between revisions of "Telecon 02.28.13 materials"

From Earth Science Information Partners (ESIP)
(Created page with " = Plans for February 28, 2013 telecon = == Literature review == *Clarify Goals *Review "article review framework" for ability to meet those goals *Look at article list, dis...")
 
Line 1: Line 1:
  
 
= Plans for February 28, 2013 telecon =
 
= Plans for February 28, 2013 telecon =
 +
 +
== Accomplished this month ==
 +
*data life cycle model identified
 +
**goal: identify, constrain scope of survey
 +
**a linear model, but feedback loops are implied
 +
*a diagram showing data life cycle model, activites, concerns, perspectives
 +
*an instance of that diagram with highlights showing categories covered by one article from the literature review list
 +
*a document with a straw man framework for article evaluation
  
 
== Literature review ==
 
== Literature review ==
Line 15: Line 23:
  
 
"Plans are useless, but planning is essentail."  -Eisenhower
 
"Plans are useless, but planning is essentail."  -Eisenhower
 +
 +
== Steps for March ==
 +
TBD

Revision as of 11:18, February 28, 2013

Plans for February 28, 2013 telecon

Accomplished this month

  • data life cycle model identified
    • goal: identify, constrain scope of survey
    • a linear model, but feedback loops are implied
  • a diagram showing data life cycle model, activites, concerns, perspectives
  • an instance of that diagram with highlights showing categories covered by one article from the literature review list
  • a document with a straw man framework for article evaluation

Literature review

  • Clarify Goals
  • Review "article review framework" for ability to meet those goals
  • Look at article list, discuss list membership (what, if any, new articles should we add? by what criteria?)

Our working group goals

  • Overall
  • July goals
  • December goals

"Plans are useless, but planning is essentail." -Eisenhower

Steps for March

TBD